Equipment:
Digital theodolite, tripod stand, leveling staff, ranging rods, plum bob, prismatic compass, and tape.
Procedure:
- Mark station A then mark North with the help of a prismatic compass at station A.
- Set the instrument at station A and done the temporary adjustment.
- Horizontal clamp is kept fixed and the vertical clamp loosened, then set telescope at 90˚ with the help of the vertical clamp and vertical screw.
- Now the vertical clamp is tightly fixed and horizontal clamp is loosened and telescope is directed towards north and bisect the ranging rod.
- Horizontal clamp is fixed and set horizontal angle as 0˚ by using a reset button.
- Now loose the horizontal clamp and the telescope is directed towards B and bisect the ranging rod at B.
- Note the H.A. displayed at display screen, which is the bearing of line AB.
- Then measure the distance from station A to B with the help of tape and note it in the observation table.
- Repeat the above process for bearings and distances of lines BC, CD, DE, and EA.
- Find the latitude by using LCosθ and departure by using LSineθ (where L is distance of the line and θ is the bearing of that line).
- Let the coordinates of point A as (0, 0).
- And find the coordinates of other stations by adding latitudes and departures in the coordinates of station A.
- The coordinates are arranged in determinant form as follows.
Station | A | B | C | D | E | A |
Latitude | Y1 | Y2 | Y3 | Y4 | Y5 | Y1 |
Departure | X1 | X2 | X3 | X4 | X5 | X1 |
- Sum of products along the solid line,
∑P = (Y1.X2+Y2.X3+Y3.X4+Y4.X5+Y5.X1)
- Sum of products along the dotted lines,
∑Q = (X1.Y2+X2.Y3+X3.Y4+X4.Y5+X5.Y1)
- Now area is calculated by following formula, Area = 1/2 x (∑P –∑Q)
Observations
Line | Length (ft) | Bearing | Consecutive Coordinates | Error in Coordinates | Corrected coordinates | Independent coordinates | ||||
——– | ———- | ——- | Lat: | Dep: | Lat: | Dep: | Lat: | Dep: | Easting | Northing |
A | ——– | ——– | —- | —- | —- | —- | —— | —- | 0 | 0 |
AB | 29.08 | 34ᶱ26’30’’ | 23.98 | 16.446 | +0.29 | -4.188 | 24.27 | +12.26 | 12.26 | 24.27 |
BC | 29.667 | 108ᶱ2’10’’ | -9.185 | 28.209 | +0.295 | -4.272 | -8.89 | 23.94 | 36.2 | 15.38 |
CD | 30.5 | 183ᶱ52’10’’ | -30.43 | -2.058 | +0.304 | -4.392 | -30.13 | -6.45 | 29.75 | -14.75 |
DE | 22.916 | 246ᶱ4’30’’ | -9.29 | -20.95 | +0.229 | -3.30 | -9.06 | -24.25 | 5.5 | -23.81 |
EA | 23.667 | 354ᶱ55’30’’ | 23.57 | -2.09 | +0.236 | -3.41 | 23.81 | -5.5 | 0 | 0 |
——- | ∑P= 135.82 | ——- | ∑Lat= – 1.355 | ∑Dep= +19.561 | Sum= +1.354 | Sum= – 19.562 | ∑ lat: 0 | ∑ dep: 0 | —– | —– |
AreaCalculations
Station | A | B | C | D | E | A |
Northing | 0 | 24.27 | 15.38 | -14.75 | -23.81 | 0 |
Easting | 0 | 12.26 | 36.2 | 29.75 | 5.5 | 0 |
∑P = 1255.0
∑Q = -1053.7387
Area = 1/2 x (∑P –∑Q)
Area = 1/2 x (1255 – (-1053.7387)) = 1154.36 ft2