Surveying-I PR

S.

No

Topics
1.

a). Introduction to Health and Safety measures in Surveying Lab.

b). Introduction to various Surveying Instruments.

2.To measure the horizontal distance between two terminal stations by different methods.
(Pacing, Measuring Tape, and Chain).To range out a survey line when the two ends of a line are inter-visible from each end.
3.To range out a survey line when the two ends of a line are inter-visible from each end.
4.To range out a survey line and mark the intermediate points
when two ends of lines are not inter-visible from each end. (Indirect Ranging).
5.To determine the horizontal distance between the two terminal stations
on a sloping ground by (i). Stepping Method.
6.

To determine the horizontal distance between the two terminal stations


on a sloping groundby (i). Using Abney Level

7.To set out the base line and Perpendicular lines / Offsets in the field.
8.Layout of rooms of a house by offset method using Pythagoras Theorem.
9.Introduction to Automatic Level and Temporary Adjustment of an Automatic Level.
10.To determine the Staff Readings at different points on the natural ground by Auto Level.
11.To determine the reduced level of an existing Road-Profile Levelling.
12.To collect data for cross sectional levelling of a proposed road using Auto Level.
13.To draw Profile of a Road (L-section) from the obtained level data.
14.To draw Cross sections of a proposed road from obtained level data.
15.To determine area of an irregular boundary by Simpson’s Rule.
16.To perform an open-ended lab.