S. No | Topics |
1. | a). Introduction to Health and Safety measures in Surveying Lab. b). Introduction to various Surveying Instruments. |
2. | To measure the horizontal distance between two terminal stations by different methods. (Pacing, Measuring Tape, and Chain).To range out a survey line when the two ends of a line are inter-visible from each end. |
3. | To range out a survey line when the two ends of a line are inter-visible from each end. |
4. | To range out a survey line and mark the intermediate points when two ends of lines are not inter-visible from each end. (Indirect Ranging). |
5. | To determine the horizontal distance between the two terminal stations on a sloping ground by (i). Stepping Method. |
6. | To determine the horizontal distance between the two terminal stations on a sloping groundby (i). Using Abney Level |
7. | To set out the base line and Perpendicular lines / Offsets in the field. |
8. | Layout of rooms of a house by offset method using Pythagoras Theorem. |
9. | Introduction to Automatic Level and Temporary Adjustment of an Automatic Level. |
10. | To determine the Staff Readings at different points on the natural ground by Auto Level. |
11. | To determine the reduced level of an existing Road-Profile Levelling. |
12. | To collect data for cross sectional levelling of a proposed road using Auto Level. |
13. | To draw Profile of a Road (L-section) from the obtained level data. |
14. | To draw Cross sections of a proposed road from obtained level data. |
15. | To determine area of an irregular boundary by Simpson’s Rule. |
16. | To perform an open-ended lab. |