S# | Topic |
1 | Introduction and overview of the subject |
2 | Significance of cost estimation in construction industry |
3 | Estimate and its’ types |
4 | Role of Quantity Surveyor at different organizational levels |
5 | Importance of preliminary estimate in administrative approval of public sector projects |
6 | Main requirements and factors to be considered while preparing a detailed estimate |
7 | Scope of civil engineering works and its’ impact on cost estimate |
8 | Quantity estimation (Foundation and Load Bearing wall) |
9 | Working out Quantities of a single Room (Separate wall Method) |
10 | Working out Quantities of Two Room Building (Separate wall Method) |
11 | Working out Quantities of a single Room (Centre Line Method) |
12 | Working out Quantities of Two Room Building (Centre Line Method) |
13 | Basic concepts for calculation of quantities in R.C.C Structures |
14 | Calculation of quantities of a R.C.C pile and column |
15 | Quantities of Concrete and Steel – R.C.C Beams |
16 | Quantities of Concrete and Steel -R.C.C Slab and Staircase |
17 | Quantities of Concrete and Steel –Retaining wall |
18 | Quantities of Steel Structures |
19 | Road Works (Earthwork in filling) |
20 | Road Works (Earthwork in filling & cutting) |
21 | Sewer and Water main pipe Works |
22 | Task or Out-turn work, Importance of Rate Analysis (R.A) |
23 | Significance of Labor productivity calculation in RA |
24 | Factors influencing R.A of different construction works |
25 | Specifications for various items in construction |
26 | Specifications and general practice in government departments for schedule of rates |