Quantity Surveying and Estimation Lesson Contents

INTRODUCTIONANDQUANTITY CALCULATION OF VARIOUS CIVIL ENGINEERING WORKS:


  • Introduction and overview of the subject

  • Significance of cost estimation in construction industry

  • Estimate and its’ types

  • Role of quantity surveyor at different organizational levels

  • Importance of preliminary estimate in administrative approval of public sector projects

  • Main requirements and factors to be considered while preparing a detailed estimate

  • Scope of civil engineering works and its’ impact on cost estimate

  • Preliminary estimate of various buildings

  • Load bearing structures (Quantity calculation using Separate wall and Center line methods)

  • R.C.C structures (Quantity calculation related to Column, Beam, Slab, Staircase and Retaining wall)

  • Road works (Lead and Lift, Calculation of earthwork using different methods)

  • Concepts related to quantity calculation of bridges and steel structures

  • Quantity calculation of sewerage and water supply works

RATEANALYSIS,BILLOFQUANTITIES (BOQ), TENDERING & AWARD OF WORKS


  • Task or Out-turn work

  • Importance of Rate Analysis (RA)

  • Significance of productivity calculation in RA

  • Factors influencing RA

  • Specifications of various items in construction

  • Schedule of rates in public sector

  • RA of different items

  • Preparing BOQ, Maintaining Measurement

Book (MB)


  • Types of contracts

  • Preparationoftenderdocumentsand evaluation of bids

  • Security deposit, Earnest money

  • Valuation of buildings and its’ purpose

  • Procedure for award of works in public sector