Quantity Surveying & Estimation

S#Topic
1Introduction and overview of the subject
2Significance of cost estimation in construction industry
3Estimate and its’ types
4Role of Quantity Surveyor at different organizational levels
5Importance of preliminary estimate in administrative approval of public sector projects
6Main requirements and factors to be considered while preparing a detailed estimate
7Scope of civil engineering works and its’ impact on cost estimate
8Quantity estimation (Foundation and Load Bearing wall)
9Working out Quantities of a single Room (Separate wall Method)
10Working out Quantities of Two Room Building (Separate wall Method)
11Working out Quantities of a single Room (Centre Line Method)
12Working out Quantities of Two Room Building (Centre Line Method)
13Basic concepts for calculation of quantities in R.C.C Structures
14Calculation of quantities of a R.C.C pile and column
15Quantities of Concrete and Steel – R.C.C Beams
16Quantities of Concrete and Steel -R.C.C Slab and Staircase
17Quantities of Concrete and Steel –Retaining wall
18Quantities of Steel Structures
19Road Works (Earthwork in filling)
20Road Works (Earthwork in filling & cutting)
21Sewer and Water main pipe Works
22Task or Out-turn work, Importance of Rate Analysis (R.A)
23Significance of Labor productivity calculation in RA
24Factors influencing R.A of different construction works
25Specifications for various items in construction
26Specifications and general practice in government departments for schedule of rates
27R.A of Excavation and Lean Concrete
28Rate Analysis of R.C.C work
29Rate Analysis of Brick Masonry and Plastering
30Bill of Quantities for a project, Maintaining measurement book
31Preliminary Estimate of Various Buildings
32Types of Contracts
33Preparation of Contract and tender documents, Evaluation of Bids
34Valuation of Buildings, Obsolescence, Depreciation and Sinking Fund
35General Procedure for award of works in Public Works Departments