Engineering Surveying (Practicals)

S.

No

Topics

1.

(a):Introduction to Health and Safety measures.
in Engineering Surveying Lab.

(b):Introduction to various Surveying instruments.


(c):Various methods and equipmentused for measuring distance.

2.To range out a survey line when the two ends of a line are
inter-visible from each end,
and when two end points are
not inter-visible from each end (Direct and Indirect Ranging).
3.To measure the horizontal distance between two terminal stations
by different methods when the ground is flatand
to determine the horizontal distance between the two terminal stations
on a sloping ground by (I) Stepping Method (II) Using Abney Level.
4.To set out the base line and Perpendicular line / Offsets in the field.

5.

Introduction to Automatic level and temporary adjustment
of Automatic level.
6.To collect data for Profile Levelling and cross sectional leveling
of a proposed road using Auto Level.

7.

To draw profile of a road (L-Section) and Cross-sections
of a proposed road from obtained level data.

8.

Introduction to theodolite and its temporary adjustment
and to determine the Horizontal angles, vertical angles and bearing of lines.
9.To determine the independent coordinates of an existing building
by theodolite traversing.
10.To determine horizontal distances by tacheometric Surveying
when the line of sight is horizontal.
11.To set out the Simple Circular Curve by deflection Angle method.
12.To determine R.L at top of elevated object by Trigonometric Leveling.

13.

Orientation of Total Station and its Adjustment.
14.To collect data for contour map of a given area of land by using total station.
15.To set out layout of a building by using coordinate method
with the help of total station.
16.To perform an open-ended lab.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top